1. |
Wrap tape around the driveshaft spline(TJ) to prevent damage to
the boot.
|
2. |
Using the alignment marks (D) made during disassembly as a guide,
install the spider assembly (A) and retainer ring (B) on the driveshaft
splines (C).
|
3. |
Add specified grease to the joint boot as much as it was wiped
away at inspection.
|
4. |
Install the both boot band.
|
5. |
Using the SST(09495-3K000), secure the TJ boot bands.
|
6. |
Install the front driveshaft.
(Refer to Driveshaft Assembly - “Front Driveshaft”)
|
Starter Installation
1.
Install in the reverse order of removal.
Starter installation bolt:
49.0 ~ 63.7 N.m (5.0 ~ 6.5 kgf.m, 36.2 ~ 47.0 lb-ft)
...
Installation
•
Install the component with the specified torques.
•
...