Blower Unit Replacement
1.
Disconnect the negative (-) battery terminal.
2.
Recover the refrigerant with a recovery/recycling/charging station.
3.
...
Ignition Coil Inspection
1.
Measure the primary coil resistance between terminals (+) and
(-).
Standard value:
0.62Ω В± 10%
...
Power Door Lock Switch Installation
Driver Power Window Main Switch
1.
Install the driver power window switch assembly and connectors.
2.
Install the front door trim.
...