1. |
Disconnect the battery negative terminal.
|
2. |
Remove the fuse box cover.
|
3. |
Remove the starter relay(A).
|
4. |
Using an ohmmeter, check that there is continuity between each
terminal.
|
5. |
Apply 12V to terminal 85 and ground to terminal 86.
Check for continuity between terminals 30 and 87.
|
6. |
If there is no continuity, replace the starter relay.
|
7. |
Install the starter relay.
|
8. |
Install the fuse box cover.
|
Positive Crankcase Ventilation (PCV) Valve Installation
1.
Install in the reverse order of removal.
PCV Valve installation:
1.9 ~ 2.8 N.m (0.19 ~ 0.29 kgf.m, 1.4 ~ 2.1 lb-ft)
...
Rear Differential Carrier Component
1. Rear Differential Carrier
2. Coupling Assembly
...
Troubleshooting
Problem Symptoms Table
Use the table below to help you find the cause of the problem. The numbers
indicate the priority of the like cause of the problem. Check each part in order.
...