ECM Problem Inspection Procedure
1.
TEST ECM GROUND CIRCUIT: Measure resistance between ECM and chassis
ground using the backside of ECM harness connector as ECM side check
point. If the problem is fo ...
Muffler Removal and Installation
1.
Remove the front muffler (A) after loosening the mounting nuts.
Tightening torque:
39.2 ~ 58.8 N.m (4.0 ~ 6.0 kgf.m, 28.9 ~ 43.4 lb-ft ...
Fuel Filler Door Release Actuator Inspection
1.
Remove the fuel filler cover (A) after loosening screws (2EA).
2.
Remove the fuel filler door module (A).
...