• |
Adjust a shift cable.
|
• |
Refill engine with engine oil.
|
• |
Refill a transaxle with fluid.
|
• |
Refill power steering fluid.
|
• |
Refill a radiator and a reservoir tank with engine coolant.
|
• |
Place a heater control knob on "HOT" position.
|
• |
Clean battery posts and cable terminals and assemble.
|
• |
Inspect for fuel leakage.
|
- |
After assemble the fuel line, turn on the ignition switch (do not operate
the starter) so that the fuel pump runs for approximately two seconds
and fuel line pressurizes.
|
- |
Repeat this operation two or three times, then check for fuel leakage
at any point in the fuel line.
|
• |
Bleed air from the cooling system.
|
- |
Start engine and let it run until it warms up. (until the radiator fan
operates 3 or 4 times.)
|
- |
Turn Off the engine. Check the level in the radiator, add coolant if
needed. This will allow trapped air to be removed from the cooling system.
|
Tightening Torques
Item
kgf.m
N.m
lb-ft
Positive Crankcase Ventilation (PCV) Valve installation
0.19 ~ 0.29
1.9 ~ 2.8
1.4 ~ 2.1
...
General Troubleshooting Information
Before Troubleshooting
1.
Check applicable fuses in the appropriate fuse/relay box.
2.
Using the battery checker (MCR-570 KIT), check the ba ...
Temperature Control Actuator Inspection
1.
Turn the ignition switch OFF.
2.
Disconnect the temperature control actuator connector.
3.
Verify that the t ...