[1st Method] |
1. |
Start the engine and keep the engine running at idle for 2 minutes.
|
2. |
Step on the accelerator pedal and hold it steady at 4500 rpm with
the shift lever in N position to warm up the engine until the
temperature of the engine coolant reaches 80°C.
|
3. |
Keep the engine running at 2500~3000 rpm in the N position for
15 minutes.
|
[2nd Method] |
|
1. |
Start the engine and keep the engine running at idle for 2 minutes.
|
2. |
Drive the vehicle for over 20 minutes, keeping the engine speed
above 3500 rpm.
|
Installation
•
Install the component with the specified torques.
•
...
Timing Chain Removal
1.
Remove the cylinder head cover.
(Refer to Cylinder Head Assembly - "Cylinder Head Cover")
2.
Turn the crankshaft pulley and ...
Heater & A/C Control Unit (DATC) Replacement
1.
Disconnect the negative (-) battery terminal.
2.
Using a screwdriver or remover, remove the center fascia panel
(A).
...