1. |
Install the intakeCVVT assembly(A), exhaust CVVT assembly(B) and camshaft(C).
|
2. |
Install the camshafts.
|
3. |
Install camshaft bearing caps (A) in their proper locations.
Tightening order
Group A → Group B → Group C.
|
4. |
Install the high pressure fuel pump(A).
|
5. |
Install the ratchet of the timing chain tensioner by pushing the link
up using a thin rod.
|
6. |
Install the service hole bolt of the timing chain cover.
|
7. |
Install the cylinder head cover.
(Refer to Cylinder Head Assembly - "Cylinder Head Cover")
|
Input Speed Sensor Signal Waveform
...
Multimedia Jack Installation
1.
Install the Multimedia jack.
2.
Install the console upper cover.
...
IPM Removal
1.
Disconnect the negative (-) battery terminal.
2.
Remove the crash pad lower panel (A).
(Refer to Body - "Crash pad")
...