1. |
Install the AC inverter unit.
|
2. |
Install the luggage side trim.
|
3. |
Connect the negative (-) battery terminal.
|
Adjustment
1.
Operate the horn, and adjust the tone to a suitable level by turning
the adjusting screw.
...
TJ Joint Inspection
1.
Check the spider assembly for roller rotation, wear or corrosion.
2.
Check the groove inside the joint case for wear or corrosion
...
Fuel Tank Installation
1.
Install in the reverse order of removal.
Fuel tank band installation
bolt:
44.1 ~ 58.8 N.m (4.5 ~ 6.0 kgf.m, 32.6 ~ 43.4 lb-ft)
...