1. |
Measure the pressure of high pressure line by measuring voltage
output between terminal “1” and “2”.
|
2. |
Inspect the voltage value whether it is sufficient to be regular
value or not.
|
3. |
If the measured voltage value is not wihtin specification, replace
the A/C pressure transducer.
|
Auto Head lamp leveling Unit Inspection with GDS
Initialization and diagnosis sequence by using GDS equipment.
Below content summarize the procedure for A/S using GDS.
No.
Procedure
1
Locate vehicle to flat ...
Input Speed Sensor Specifications
▷ Type: Hall effect sensor
Operation condition (°C)°F
((-)40 ~ 150)) -40 ~ 302
Air gap(mm)in.
(0.95 ~ 1.55) 0.950 ~ 1.55
Output voltage ...
Description
Ignition timing is controlled by the electronic control ignition timing
system.
The standard reference ignition timing data for the engine operating conditions
are pre-pro grammed in the ...