1. |
Measure the pressure of high pressure line by measuring voltage
output between terminal “1” and “2”.
|
2. |
Inspect the voltage value whether it is sufficient to be regular
value or not.
|
3. |
If the measured voltage value is not wihtin specification, replace
the A/C pressure transducer.
|
Front Washer Motor Installation
1.
Reassemble the washer reservoir.
Before installing the pump motor, che ...
Cylinder Head Inspection
Cylinder Head
1.
Inspect for flatness.
Using a precision straight edge and feeler gauge, measure the surface
the contacting the cylinder block and the manifolds fo ...
Input Speed Sensor Installation
1.
Install in the reverse order of removal.
•
...