1. |
Turn the ignition switch OFF.
|
2. |
Disconnect the VIS valve connector.
|
3. |
Measure resistance between VIS valve terminals 1 and 2.
|
Quarter Fixed Glass Installation
1.
With a putt knife, scrape the old adhesive smooth to a thickness
of about 2mm (0.08 in.) on the bonding surface around the entire quarter
fixed glass flange.
...
Opening the hood
1. Pull the release lever to unlatch the hood. The hood should pop open slightly.
WARNING
Open the hood after turning off the engine on a flat surface, shifting the
shift lever to the P (Park) po ...
Battery Installation
1.
Install in the reverse order of removal.
Battery (-)terminal installation
nut:
4.0 ~ 6.0 N.m (0.4 ~ 0.6 kgf.m, 3.0 ~ 4.4 lb-ft) ...