1. |
Wrap tape around the driveshaft spline(TJ) to prevent damage to
the boot.
|
2. |
Using the alignment marks (D) made during disassembly as a guide,
install the spider assembly (A) and retainer ring (B) on the driveshaft
splines (C).
|
3. |
Add specified grease to the joint boot as much as it was wiped
away at inspection.
|
4. |
Install the both boot band.
|
5. |
Using the SST(09495-3K000), secure the TJ boot bands.
|
6. |
Install the front driveshaft.
(Refer to Driveshaft Assembly - “Front Driveshaft”)
|
ICM Relay Box Inspection
Rear Wiper Motor relay
Check for continuity between the terminals.
1.
There should be continuity between the No.1 and No.3 terminals
when power and ground are conne ...
Canister Close Valve (CCV)
Canister Close Valve (CCV) is installed on the canister ventilation line.
It seals evaporative emission control system by shutting the canister from the
atmosphere when leakage detecting syst ...
Installation
1.
Install the mirror making sure the mounting bracket not to be
damaged.
2.
Install the mirror wiring cover after reconnecting the connect ...