1. |
Measure the resistance between the terminals.
|
2. |
The measured resistance is not within specification, the blower
resistor must be replaced. (After removing the resistor)
|
Reservoir Tank Removal and Installation
1.
Remove the over flow hose(A).
2.
Remove the reservoir tank(B) after loosening the bolts.
Tightening torque:
...
Installation
1.
Install the back view camera.
2.
Install the tailgate garnish and trim.
...
Emergency Fastening Device (EFD) Removal
1.
Disconnect the battery negative cable, and wait for at least thirty
seconds before beginning work.
2.
Remove the EFD cover pad (A).
...